焦化氣發電機組電氣系統調試

返回 2025.11.13 來源:http://m.pyucoin.com 0

  焦化氣發電機組構成及發電原理在工程中各發電廠所使用的焦化氣發電機組品牌不同,有國內設備、也有國外設備,其功率大小也不盡相同,但從整個瓦斯發電工藝流程來看是一致的,其系統都是由進氣排氣系統、點火系統、潤滑系統、冷卻系統、綜合控制等系統構成。瓦斯電站布局示意圖煤層氣發電工程中都建有儲氣柜,保證燃機用氣的穩定。

  The composition and power generation principle of coking gas generator units vary among different brands of coking gas generator units used in various power plants in the project, including domestic and foreign equipment, and their power levels are also different. However, from the perspective of the entire gas power generation process, they are consistent, and their systems are composed of intake and exhaust systems, ignition systems, lubrication systems, cooling systems, comprehensive control systems, etc. Gas power station layout diagram: Gas storage tanks are built in coalbed methane power generation projects to ensure the stability of gas supply for gas turbines.base64_image

  儲氣柜中的瓦斯氣體經過瓦斯氣預處理系統后,到達燃氣機組進入燃機混合器中,同時空氣經過空氣濾芯后同時進入混合器。在燃機混合器內,燃機對空氣和瓦斯氣進行自動配比后形成混合氣體,混合氣體經過渦輪增壓器后,再經過冷卻器進行兩級冷卻,使氣體溫度穩定在一定范圍內,通過不斷調整節氣閥,從而調整進氣量,最后進入氣缸內進行壓縮、做功,從而使發動機驅動發電機進行發電。焦化氣發電機組經做功排出的廢氣一般供給余熱鍋爐及其他換熱設備或直接排入大氣中。

  The gas in the gas storage tank passes through the gas pre-treatment system and enters the gas turbine mixer. At the same time, the air passes through the air filter and enters the mixer. In the gas turbine mixer, the gas turbine automatically proportions air and gas to form a mixed gas. After passing through the turbocharger, the mixed gas is cooled in two stages by the cooler to stabilize the gas temperature within a certain range. By continuously adjusting the throttle valve, the intake air volume is adjusted, and finally it enters the cylinder for compression and work, so that the engine drives the generator to generate electricity. The exhaust gas discharged from the coking gas generator unit through work is generally supplied to waste heat boilers and other heat exchange equipment or directly discharged into the atmosphere.

  焦化氣發電機組電氣系統調試

  Electrical system commissioning of coking gas generator set

  焦化氣發電機組中機務、熱工、電氣等系統試運行前必須經過調試才可以投運,這是機組安全投運的重要保證,其中電氣系統調試主要流程見圖1。  電氣系統調試流程

  Before the trial operation of the mechanical, thermal, electrical and other systems in the coking gas generator unit, they must be debugged, which is an important guarantee for the safe operation of the unit. The main process of electrical system debugging is shown in Figure 1. Electrical system debugging process

  1.調試準備焦化氣發電機組本體設備安裝、內部與外部系統一次電纜、二次電纜接線完畢,具備合格的交直流電源并具備送電條件,現場調試照明設施及消防安全設施齊備。焦化氣發電機組的圖紙及技術資料齊全,發電機組保護及自動控制裝置的整定值計算及相關參數設定值已經計算、匯總完成。調試用微機保護校驗儀、數字式絕緣電阻測試儀、高壓核相器、相序表、數字相位表、互感器特性測試儀、機組啟動測控儀、高壓耐壓試驗儀等調試設備齊全,設備性能符合現場調試要求、安全可靠且在鑒定有效期內。

  1. Preparation for commissioning: The installation of the main equipment of the coking gas generator unit, the wiring of the primary and secondary cables of the internal and external systems, and the qualified AC/DC power supply and power transmission conditions have been completed. The on-site commissioning lighting facilities and fire safety facilities are complete. The drawings and technical data of the coking gas generator unit are complete, and the setting values and related parameter settings of the generator unit protection and automatic control devices have been calculated and summarized. The debugging equipment includes microcomputer protection calibrator, digital insulation resistance tester, high-voltage core phase transformer, phase sequence meter, digital phase meter, transformer characteristic tester, unit start-up measurement and control instrument, high-voltage withstand voltage tester, etc. The equipment performance meets the requirements of on-site debugging, is safe and reliable, and is within the validity period of identification.

  2.控制系統帶電及輔助設備試運

  2. Control system live and auxiliary equipment trial operation

  依據設備廠家提供的控制柜接線圖檢查內部接線回路、各回路元器件及插件安裝情況。確認沒有卡件松動、導線虛接等情況。然后使系統控制柜內所有電源開關處于斷開位置,用500V絕緣電阻測試儀測量線路對外殼絕緣電阻,應無短路、接地現象。對地絕緣電阻值應滿足設計及相關技術規范要求。檢查外部電源情況正常后。按技術說明書依次投入各路控制電源。使機組本體綜合電子管理系統、輔助設備控制系統帶電。送電后觀察控制柜中裝置面板的指示燈是否點亮、顯示是否正常。修改電子管理系統時鐘及各系統參數,斷、合直流電源后,各參數應保證不變。有雙路電源供電的應進行冗余電源切換試驗。在機組機務、熱工等調試人員配合下,檢查燃機系統中變頻裝置、冷卻風機、潤滑油泵、電動門、電磁閥等燃機輔助設備是否具備送電條件,確認無誤后對附屬設備進行送電及試運行,試驗合格標準參照各專業標準執行。

  Check the internal wiring circuit, components and plug-in installation of each circuit according to the control cabinet wiring diagram provided by the equipment manufacturer. Confirm that there are no loose card components or loose wire connections. Then make all power switches in the system control cabinet in the disconnected position, and use a 500V insulation resistance tester to measure the insulation resistance of the circuit to the shell. There should be no short circuit or grounding phenomenon. The ground insulation resistance value should meet the requirements of the design and relevant technical specifications. After checking that the external power supply is functioning properly. Input each control power supply in sequence according to the technical manual. Make the integrated electronic management system and auxiliary equipment control system of the unit live. After power transmission, observe whether the indicator lights on the device panel in the control cabinet are lit and whether the display is normal. Modify the clock and various system parameters of the electronic management system, and ensure that all parameters remain unchanged after disconnecting and connecting the DC power supply. Redundant power switching test should be conducted for those with dual power supply. With the cooperation of the unit maintenance and thermal commissioning personnel, check whether the auxiliary equipment of the gas turbine system, such as the frequency converter, cooling fan, lubricating oil pump, electric door, solenoid valve, etc., have the power transmission conditions. After confirming that there are no errors, power transmission and trial operation of the auxiliary equipment are carried out. The qualified test standards shall be implemented in accordance with the standards of each profession.

  3.機組發電機轉子、定子及互感器試驗

  3. Test of rotor, stator and transformer of the generator unit

  焦化氣發電機組中一次設備除發電機定子、轉子外,一般還帶有電流及電壓互感器。對于封裝在機組內部的互感器可以不進行試驗,重點檢查出廠試驗報告相關數據是否滿足標準要求,具備試驗條件的按交接試驗標準進行。試驗項目及合格標準參照電氣裝置安裝工程電氣設備交接試驗相關要求執行,主要試驗項目有轉子定子絕緣電阻、繞組直流電阻、互感器變比、接線組別及極性、勵磁特性曲線、交流耐壓等試驗,試驗測量結果應滿足規范和制造廠設計文件要求。所有試驗項目嚴格按規范標準及電氣設備調試作業指導書的要求進行。保證測量結果真實、準確。試驗過程中對安裝完的設備及接線拆動的,試驗完成后必須按安裝的設計要求恢復。同時為了防止設備污染或損壞,調試完成后必須恢復設備原有的防護罩及相關保護設施。部分設備需要廠家指導及協助進行的調試項目,調試前需要及時聯系廠家到達現場,并積極配合現場技術人員,落實好安全技術措施。調試中如果遇到問題。必須及時解決并報告主管負責人。

  In addition to the stator and rotor of the generator, the primary equipment in coking gas generator sets generally also includes current and voltage transformers. For transformers packaged inside the unit, testing is not required. The focus is on checking whether the relevant data in the factory test report meets the standard requirements. If the testing conditions are met, the handover test standards shall be followed. The test items and qualification standards shall be carried out in accordance with the relevant requirements of the electrical equipment handover test for electrical installation engineering. The main test items include rotor stator insulation resistance, winding DC resistance, transformer ratio, wiring group and polarity, excitation characteristic curve, AC withstand voltage and other tests. The test measurement results shall meet the requirements of the specifications and manufacturer's design documents. All experimental projects shall be strictly carried out in accordance with the requirements of the specifications, standards, and electrical equipment commissioning operation manual. Ensure that the measurement results are true and accurate. During the experiment, if the installed equipment and wiring are disassembled, they must be restored according to the installation design requirements after the experiment is completed. At the same time, in order to prevent equipment contamination or damage, the original protective cover and related protective facilities of the equipment must be restored after debugging is completed. Some equipment requires guidance and assistance from the manufacturer for debugging projects. Before debugging, it is necessary to promptly contact the manufacturer to arrive at the site and actively cooperate with on-site technical personnel to implement safety technical measures. If encountering problems during debugging. It must be resolved promptly and reported to the supervisor in charge.

  4.機組電氣保護整定及傳動試驗

  4. Electrical protection setting and transmission test of the unit

  焦化氣發電機組的電氣保護一般設置有過載、高頻低頻、差動、接地、勵磁故障等,不同的廠家保護配置有所不同。試驗時參照燃機電氣保護裝置技術文件,對定值單的內容逐項進行核對,設置保護模塊中機組發電機各側的CT變比、PT變比、電流電壓值及各種保護參數。調試時用繼電保護測試儀對保護模塊進行相應的模擬故障試驗,使保護可靠動作,檢查各插件面板指示燈動作及出口繼電器輸出情況,用萬用表在端子排查該保護的所有跳閘出口接點動作是否正確,外部有連鎖的接點檢查連鎖動作情況。一般應重點檢查發電機保護動作后連鎖跳閘出口高壓開關、瓦斯氣預處理系統輸入及排空閥、廠區鍋爐系統等連鎖動作情況。驗證各系統邏輯動作的準確性及可靠性。試驗過程中需要注意跳閘出口繼電器輸出接點極性應與外回路直流電源極性配合。

  The electrical protection of coking gas generator units generally includes overload, high frequency and low frequency, differential, grounding, excitation faults, etc., and the protection configuration varies among different manufacturers. During the experiment, refer to the technical documents of the gas turbine electrical protection device, check the contents of the fixed value sheet item by item, and set the CT ratio, PT ratio, current and voltage values, and various protection parameters on each side of the generator in the protection module. During debugging, use a relay protection tester to conduct corresponding simulated fault tests on the protection module to ensure reliable operation of the protection. Check the operation of the indicator lights on each plugin panel and the output of the outlet relay. Use a multimeter to check whether all the tripping outlet contacts of the protection are operating correctly at the terminals. Check the interlocking operation of external contacts with interlocking connections. Generally, it is important to focus on checking the interlocking actions of the high-voltage switch at the outlet of the generator after the protection action, the input and exhaust valves of the gas pre-treatment system, and the boiler system in the factory area. Verify the accuracy and reliability of the logical actions of each system. During the experiment, it is important to note that the polarity of the output contact of the trip outlet relay should be coordinated with the polarity of the external DC power supply.

  5.機組啟動及并網

  5. Unit start-up and grid connection

  按焦化氣發電機組操作規程及相關技術文件要求,現場試驗階段的啟動由設備廠家負責起動。現場檢測起動過程中各參數是否在正常運行范圍內,瓦斯機組整體嚴密性是否合格,沒有出現漏油、漏水、漏氣等情況。同時熟悉機組在手動、自動控制狀態下的操作控制,查看各動態參數是否正常。在焦化氣發電機組額定轉速下,完成機組啟動相關試驗。電氣相關試驗主要有空載試驗和短路試驗,通過試驗檢查機組電壓電流回路準確性、保護動作情況,錄制發電機空載特性曲線及短路特性曲線。瓦斯燃氣機組各運行參數檢查及機組本體各專業試驗完成后,核對燃機發電側電壓及系統側電壓是否滿足同期并網條件。應保證機組發電機輸出電壓、頻率、相位與系統電網數相近,經過出口高壓開關兩側核相、假同期試驗、手動或自動準確,才能同期實現焦化氣發電機組并網。

  According to the operating procedures and relevant technical documents for coking gas generator units, the equipment manufacturer is responsible for starting the on-site testing phase. On site inspection was conducted to ensure that all parameters during the start-up process were within the normal operating range, and that the overall tightness of the gas unit was qualified without any oil, water, or gas leaks. At the same time, familiarize oneself with the operation and control of the unit in manual and automatic control states, and check whether various dynamic parameters are normal. Complete the relevant tests for unit start-up at the rated speed of the coking gas generator set. Electrical related tests mainly include no-load tests and short-circuit tests. Through the tests, the accuracy of the voltage and current circuits of the unit, the protection action, and the recording of the generator's no-load characteristic curve and short-circuit characteristic curve are checked. After checking the operating parameters of the gas turbine unit and conducting various professional tests on the unit itself, verify whether the voltage on the generator side and the system side of the gas turbine meet the conditions for synchronous grid connection. It should be ensured that the output voltage, frequency, and phase of the unit generator are similar to the number of power grids in the system. Only after undergoing phase verification and false synchronization tests on both sides of the outlet high-voltage switch, manual or automatic accuracy, can the coking gas generator unit be connected to the grid synchronously.

  6.試驗記錄整理

  6. Experimental record organization

  焦化氣發電機組試驗及試運行記錄按事先準備好的記錄表格填寫,必須準確和詳細,做到每項記錄都有可追溯性。

  The test and trial operation records of coking gas generator units must be filled out in accordance with the pre prepared record form, which must be accurate and detailed, ensuring traceability for each record.

  調試過程注意事項

  Notes on Debugging Process

  調試過程注意事項:1.試驗過程中送電、送氣及其他工作事宜均由調試總負責人負責,做到各系統有序協調,專業調試人員應參加調試各階段工作的檢查、交接驗收等工作。2.焦化氣發電機組在試驗過程時一旦發生瓦斯泄漏,嚴禁在運行狀態下用鐵質工具對泄漏點進行修理緊固,應停機后將設備或管道內瓦斯排盡后再做處理,同時在發電廠區域內嚴禁吸煙,嚴禁采用非防爆設備作業,嚴禁動火動焊作業。3.電氣試驗中對回路進行絕緣測試時,應將弱電部件斷開或短接,避免損壞弱設備。嚴禁帶電拔、插插件,試驗結束后嚴禁對相關保護及參數進行更改操作,若有更改,應及時通知調試專業人員。4.調試過程中,可能出現瓦斯壓力過大,瓦斯泄漏、電氣故障跳閘等異常情況,應制定相應的安全保護措施及應急預案。

  Precautions for debugging process: 1. During the testing process, the overall person in charge of debugging is responsible for power and air supply, as well as other work matters, to ensure orderly coordination among various systems. Professional debugging personnel should participate in the inspection, handover and acceptance of each stage of debugging work. 2. In case of gas leakage during the testing process of the coking gas generator unit, it is strictly prohibited to use iron tools to repair and tighten the leakage point while in operation. The equipment or pipeline should be drained of gas before treatment after shutdown. Smoking is strictly prohibited in the power plant area, non explosion proof equipment operation is strictly prohibited, and hot work welding operation is strictly prohibited. When conducting insulation tests on circuits in electrical tests, weak electrical components should be disconnected or short circuited to avoid damaging weak equipment. It is strictly prohibited to unplug or plug in with electricity. After the test is completed, it is strictly prohibited to change the relevant protection and parameters. If there are any changes, the debugging professionals should be notified in a timely manner. During the debugging process, there may be abnormal situations such as excessive gas pressure, gas leakage, electrical failure tripping, etc. Corresponding safety protection measures and emergency plans should be formulated.

  結束語

  Conclusion

  焦化氣發電機組從安裝到并網發電,涉及到電氣、熱工、機務等各專業調試,需要各個專業相互配合才能實現機組并網發電。其中電氣系統調試貫穿干焦化氣發電機組調試整個階段。本文也僅僅就電氣專業調試程序進行了介紹與總結,許多調試及維護工作還需要設備廠家專業技術人員指導才能完成。工程實踐中還會接觸到更多不同類型的焦化氣發電機組。每位調試技術人員只有不斷學習、不斷積累經驗,才能更好地認識、掌握燃氣機組的調試。

  The installation and grid connected power generation of coking gas generator units involve various professional debugging such as electrical, thermal, and mechanical engineering, which require mutual cooperation among various professions to achieve grid connected power generation. The electrical system debugging runs through the entire stage of the commissioning of the dry coking gas generator unit. This article only introduces and summarizes the electrical professional debugging program. Many debugging and maintenance tasks still require guidance from professional technical personnel from equipment manufacturers to complete. In engineering practice, we will also come into contact with more different types of coking gas generator units. Only by continuously learning and accumulating experience can each debugging technician better understand and master the debugging of gas turbines.

  本文由 焦化氣發電機組   友情奉獻.更多有關的知識請點擊  http://m.pyucoin.com/ 真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from a coking gas generator set For more related knowledge, please click http://m.pyucoin.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

新聞搜索
濟南濟柴環能燃氣發電設備有限公司
  • 服務熱線

    0531-62325028
    0531-69951266

焦化氣發電機組電氣系統調試

  焦化氣發電機組構成及發電原理在工程中各發電廠所使用的焦化氣發電機組品牌不同,有國內設備、也有國外設備,其功率大小也不盡相同,但從整個瓦斯發電工藝流程來看是一致的,其系統都是由進氣排氣系統、點火系統、潤滑系統、冷卻系統、綜合控制等系統構成。瓦斯電站布局示意圖煤層氣發電工程中都建有儲氣柜,保證燃機用氣的穩定。

  The composition and power generation principle of coking gas generator units vary among different brands of coking gas generator units used in various power plants in the project, including domestic and foreign equipment, and their power levels are also different. However, from the perspective of the entire gas power generation process, they are consistent, and their systems are composed of intake and exhaust systems, ignition systems, lubrication systems, cooling systems, comprehensive control systems, etc. Gas power station layout diagram: Gas storage tanks are built in coalbed methane power generation projects to ensure the stability of gas supply for gas turbines.base64_image

  儲氣柜中的瓦斯氣體經過瓦斯氣預處理系統后,到達燃氣機組進入燃機混合器中,同時空氣經過空氣濾芯后同時進入混合器。在燃機混合器內,燃機對空氣和瓦斯氣進行自動配比后形成混合氣體,混合氣體經過渦輪增壓器后,再經過冷卻器進行兩級冷卻,使氣體溫度穩定在一定范圍內,通過不斷調整節氣閥,從而調整進氣量,最后進入氣缸內進行壓縮、做功,從而使發動機驅動發電機進行發電。焦化氣發電機組經做功排出的廢氣一般供給余熱鍋爐及其他換熱設備或直接排入大氣中。

  The gas in the gas storage tank passes through the gas pre-treatment system and enters the gas turbine mixer. At the same time, the air passes through the air filter and enters the mixer. In the gas turbine mixer, the gas turbine automatically proportions air and gas to form a mixed gas. After passing through the turbocharger, the mixed gas is cooled in two stages by the cooler to stabilize the gas temperature within a certain range. By continuously adjusting the throttle valve, the intake air volume is adjusted, and finally it enters the cylinder for compression and work, so that the engine drives the generator to generate electricity. The exhaust gas discharged from the coking gas generator unit through work is generally supplied to waste heat boilers and other heat exchange equipment or directly discharged into the atmosphere.

  焦化氣發電機組電氣系統調試

  Electrical system commissioning of coking gas generator set

  焦化氣發電機組中機務、熱工、電氣等系統試運行前必須經過調試才可以投運,這是機組安全投運的重要保證,其中電氣系統調試主要流程見圖1。  電氣系統調試流程

  Before the trial operation of the mechanical, thermal, electrical and other systems in the coking gas generator unit, they must be debugged, which is an important guarantee for the safe operation of the unit. The main process of electrical system debugging is shown in Figure 1. Electrical system debugging process

  1.調試準備焦化氣發電機組本體設備安裝、內部與外部系統一次電纜、二次電纜接線完畢,具備合格的交直流電源并具備送電條件,現場調試照明設施及消防安全設施齊備。焦化氣發電機組的圖紙及技術資料齊全,發電機組保護及自動控制裝置的整定值計算及相關參數設定值已經計算、匯總完成。調試用微機保護校驗儀、數字式絕緣電阻測試儀、高壓核相器、相序表、數字相位表、互感器特性測試儀、機組啟動測控儀、高壓耐壓試驗儀等調試設備齊全,設備性能符合現場調試要求、安全可靠且在鑒定有效期內。

  1. Preparation for commissioning: The installation of the main equipment of the coking gas generator unit, the wiring of the primary and secondary cables of the internal and external systems, and the qualified AC/DC power supply and power transmission conditions have been completed. The on-site commissioning lighting facilities and fire safety facilities are complete. The drawings and technical data of the coking gas generator unit are complete, and the setting values and related parameter settings of the generator unit protection and automatic control devices have been calculated and summarized. The debugging equipment includes microcomputer protection calibrator, digital insulation resistance tester, high-voltage core phase transformer, phase sequence meter, digital phase meter, transformer characteristic tester, unit start-up measurement and control instrument, high-voltage withstand voltage tester, etc. The equipment performance meets the requirements of on-site debugging, is safe and reliable, and is within the validity period of identification.

  2.控制系統帶電及輔助設備試運

  2. Control system live and auxiliary equipment trial operation

  依據設備廠家提供的控制柜接線圖檢查內部接線回路、各回路元器件及插件安裝情況。確認沒有卡件松動、導線虛接等情況。然后使系統控制柜內所有電源開關處于斷開位置,用500V絕緣電阻測試儀測量線路對外殼絕緣電阻,應無短路、接地現象。對地絕緣電阻值應滿足設計及相關技術規范要求。檢查外部電源情況正常后。按技術說明書依次投入各路控制電源。使機組本體綜合電子管理系統、輔助設備控制系統帶電。送電后觀察控制柜中裝置面板的指示燈是否點亮、顯示是否正常。修改電子管理系統時鐘及各系統參數,斷、合直流電源后,各參數應保證不變。有雙路電源供電的應進行冗余電源切換試驗。在機組機務、熱工等調試人員配合下,檢查燃機系統中變頻裝置、冷卻風機、潤滑油泵、電動門、電磁閥等燃機輔助設備是否具備送電條件,確認無誤后對附屬設備進行送電及試運行,試驗合格標準參照各專業標準執行。

  Check the internal wiring circuit, components and plug-in installation of each circuit according to the control cabinet wiring diagram provided by the equipment manufacturer. Confirm that there are no loose card components or loose wire connections. Then make all power switches in the system control cabinet in the disconnected position, and use a 500V insulation resistance tester to measure the insulation resistance of the circuit to the shell. There should be no short circuit or grounding phenomenon. The ground insulation resistance value should meet the requirements of the design and relevant technical specifications. After checking that the external power supply is functioning properly. Input each control power supply in sequence according to the technical manual. Make the integrated electronic management system and auxiliary equipment control system of the unit live. After power transmission, observe whether the indicator lights on the device panel in the control cabinet are lit and whether the display is normal. Modify the clock and various system parameters of the electronic management system, and ensure that all parameters remain unchanged after disconnecting and connecting the DC power supply. Redundant power switching test should be conducted for those with dual power supply. With the cooperation of the unit maintenance and thermal commissioning personnel, check whether the auxiliary equipment of the gas turbine system, such as the frequency converter, cooling fan, lubricating oil pump, electric door, solenoid valve, etc., have the power transmission conditions. After confirming that there are no errors, power transmission and trial operation of the auxiliary equipment are carried out. The qualified test standards shall be implemented in accordance with the standards of each profession.

  3.機組發電機轉子、定子及互感器試驗

  3. Test of rotor, stator and transformer of the generator unit

  焦化氣發電機組中一次設備除發電機定子、轉子外,一般還帶有電流及電壓互感器。對于封裝在機組內部的互感器可以不進行試驗,重點檢查出廠試驗報告相關數據是否滿足標準要求,具備試驗條件的按交接試驗標準進行。試驗項目及合格標準參照電氣裝置安裝工程電氣設備交接試驗相關要求執行,主要試驗項目有轉子定子絕緣電阻、繞組直流電阻、互感器變比、接線組別及極性、勵磁特性曲線、交流耐壓等試驗,試驗測量結果應滿足規范和制造廠設計文件要求。所有試驗項目嚴格按規范標準及電氣設備調試作業指導書的要求進行。保證測量結果真實、準確。試驗過程中對安裝完的設備及接線拆動的,試驗完成后必須按安裝的設計要求恢復。同時為了防止設備污染或損壞,調試完成后必須恢復設備原有的防護罩及相關保護設施。部分設備需要廠家指導及協助進行的調試項目,調試前需要及時聯系廠家到達現場,并積極配合現場技術人員,落實好安全技術措施。調試中如果遇到問題。必須及時解決并報告主管負責人。

  In addition to the stator and rotor of the generator, the primary equipment in coking gas generator sets generally also includes current and voltage transformers. For transformers packaged inside the unit, testing is not required. The focus is on checking whether the relevant data in the factory test report meets the standard requirements. If the testing conditions are met, the handover test standards shall be followed. The test items and qualification standards shall be carried out in accordance with the relevant requirements of the electrical equipment handover test for electrical installation engineering. The main test items include rotor stator insulation resistance, winding DC resistance, transformer ratio, wiring group and polarity, excitation characteristic curve, AC withstand voltage and other tests. The test measurement results shall meet the requirements of the specifications and manufacturer's design documents. All experimental projects shall be strictly carried out in accordance with the requirements of the specifications, standards, and electrical equipment commissioning operation manual. Ensure that the measurement results are true and accurate. During the experiment, if the installed equipment and wiring are disassembled, they must be restored according to the installation design requirements after the experiment is completed. At the same time, in order to prevent equipment contamination or damage, the original protective cover and related protective facilities of the equipment must be restored after debugging is completed. Some equipment requires guidance and assistance from the manufacturer for debugging projects. Before debugging, it is necessary to promptly contact the manufacturer to arrive at the site and actively cooperate with on-site technical personnel to implement safety technical measures. If encountering problems during debugging. It must be resolved promptly and reported to the supervisor in charge.

  4.機組電氣保護整定及傳動試驗

  4. Electrical protection setting and transmission test of the unit

  焦化氣發電機組的電氣保護一般設置有過載、高頻低頻、差動、接地、勵磁故障等,不同的廠家保護配置有所不同。試驗時參照燃機電氣保護裝置技術文件,對定值單的內容逐項進行核對,設置保護模塊中機組發電機各側的CT變比、PT變比、電流電壓值及各種保護參數。調試時用繼電保護測試儀對保護模塊進行相應的模擬故障試驗,使保護可靠動作,檢查各插件面板指示燈動作及出口繼電器輸出情況,用萬用表在端子排查該保護的所有跳閘出口接點動作是否正確,外部有連鎖的接點檢查連鎖動作情況。一般應重點檢查發電機保護動作后連鎖跳閘出口高壓開關、瓦斯氣預處理系統輸入及排空閥、廠區鍋爐系統等連鎖動作情況。驗證各系統邏輯動作的準確性及可靠性。試驗過程中需要注意跳閘出口繼電器輸出接點極性應與外回路直流電源極性配合。

  The electrical protection of coking gas generator units generally includes overload, high frequency and low frequency, differential, grounding, excitation faults, etc., and the protection configuration varies among different manufacturers. During the experiment, refer to the technical documents of the gas turbine electrical protection device, check the contents of the fixed value sheet item by item, and set the CT ratio, PT ratio, current and voltage values, and various protection parameters on each side of the generator in the protection module. During debugging, use a relay protection tester to conduct corresponding simulated fault tests on the protection module to ensure reliable operation of the protection. Check the operation of the indicator lights on each plugin panel and the output of the outlet relay. Use a multimeter to check whether all the tripping outlet contacts of the protection are operating correctly at the terminals. Check the interlocking operation of external contacts with interlocking connections. Generally, it is important to focus on checking the interlocking actions of the high-voltage switch at the outlet of the generator after the protection action, the input and exhaust valves of the gas pre-treatment system, and the boiler system in the factory area. Verify the accuracy and reliability of the logical actions of each system. During the experiment, it is important to note that the polarity of the output contact of the trip outlet relay should be coordinated with the polarity of the external DC power supply.

  5.機組啟動及并網

  5. Unit start-up and grid connection

  按焦化氣發電機組操作規程及相關技術文件要求,現場試驗階段的啟動由設備廠家負責起動。現場檢測起動過程中各參數是否在正常運行范圍內,瓦斯機組整體嚴密性是否合格,沒有出現漏油、漏水、漏氣等情況。同時熟悉機組在手動、自動控制狀態下的操作控制,查看各動態參數是否正常。在焦化氣發電機組額定轉速下,完成機組啟動相關試驗。電氣相關試驗主要有空載試驗和短路試驗,通過試驗檢查機組電壓電流回路準確性、保護動作情況,錄制發電機空載特性曲線及短路特性曲線。瓦斯燃氣機組各運行參數檢查及機組本體各專業試驗完成后,核對燃機發電側電壓及系統側電壓是否滿足同期并網條件。應保證機組發電機輸出電壓、頻率、相位與系統電網數相近,經過出口高壓開關兩側核相、假同期試驗、手動或自動準確,才能同期實現焦化氣發電機組并網。

  According to the operating procedures and relevant technical documents for coking gas generator units, the equipment manufacturer is responsible for starting the on-site testing phase. On site inspection was conducted to ensure that all parameters during the start-up process were within the normal operating range, and that the overall tightness of the gas unit was qualified without any oil, water, or gas leaks. At the same time, familiarize oneself with the operation and control of the unit in manual and automatic control states, and check whether various dynamic parameters are normal. Complete the relevant tests for unit start-up at the rated speed of the coking gas generator set. Electrical related tests mainly include no-load tests and short-circuit tests. Through the tests, the accuracy of the voltage and current circuits of the unit, the protection action, and the recording of the generator's no-load characteristic curve and short-circuit characteristic curve are checked. After checking the operating parameters of the gas turbine unit and conducting various professional tests on the unit itself, verify whether the voltage on the generator side and the system side of the gas turbine meet the conditions for synchronous grid connection. It should be ensured that the output voltage, frequency, and phase of the unit generator are similar to the number of power grids in the system. Only after undergoing phase verification and false synchronization tests on both sides of the outlet high-voltage switch, manual or automatic accuracy, can the coking gas generator unit be connected to the grid synchronously.

  6.試驗記錄整理

  6. Experimental record organization

  焦化氣發電機組試驗及試運行記錄按事先準備好的記錄表格填寫,必須準確和詳細,做到每項記錄都有可追溯性。

  The test and trial operation records of coking gas generator units must be filled out in accordance with the pre prepared record form, which must be accurate and detailed, ensuring traceability for each record.

  調試過程注意事項

  Notes on Debugging Process

  調試過程注意事項:1.試驗過程中送電、送氣及其他工作事宜均由調試總負責人負責,做到各系統有序協調,專業調試人員應參加調試各階段工作的檢查、交接驗收等工作。2.焦化氣發電機組在試驗過程時一旦發生瓦斯泄漏,嚴禁在運行狀態下用鐵質工具對泄漏點進行修理緊固,應停機后將設備或管道內瓦斯排盡后再做處理,同時在發電廠區域內嚴禁吸煙,嚴禁采用非防爆設備作業,嚴禁動火動焊作業。3.電氣試驗中對回路進行絕緣測試時,應將弱電部件斷開或短接,避免損壞弱設備。嚴禁帶電拔、插插件,試驗結束后嚴禁對相關保護及參數進行更改操作,若有更改,應及時通知調試專業人員。4.調試過程中,可能出現瓦斯壓力過大,瓦斯泄漏、電氣故障跳閘等異常情況,應制定相應的安全保護措施及應急預案。

  Precautions for debugging process: 1. During the testing process, the overall person in charge of debugging is responsible for power and air supply, as well as other work matters, to ensure orderly coordination among various systems. Professional debugging personnel should participate in the inspection, handover and acceptance of each stage of debugging work. 2. In case of gas leakage during the testing process of the coking gas generator unit, it is strictly prohibited to use iron tools to repair and tighten the leakage point while in operation. The equipment or pipeline should be drained of gas before treatment after shutdown. Smoking is strictly prohibited in the power plant area, non explosion proof equipment operation is strictly prohibited, and hot work welding operation is strictly prohibited. When conducting insulation tests on circuits in electrical tests, weak electrical components should be disconnected or short circuited to avoid damaging weak equipment. It is strictly prohibited to unplug or plug in with electricity. After the test is completed, it is strictly prohibited to change the relevant protection and parameters. If there are any changes, the debugging professionals should be notified in a timely manner. During the debugging process, there may be abnormal situations such as excessive gas pressure, gas leakage, electrical failure tripping, etc. Corresponding safety protection measures and emergency plans should be formulated.

  結束語

  Conclusion

  焦化氣發電機組從安裝到并網發電,涉及到電氣、熱工、機務等各專業調試,需要各個專業相互配合才能實現機組并網發電。其中電氣系統調試貫穿干焦化氣發電機組調試整個階段。本文也僅僅就電氣專業調試程序進行了介紹與總結,許多調試及維護工作還需要設備廠家專業技術人員指導才能完成。工程實踐中還會接觸到更多不同類型的焦化氣發電機組。每位調試技術人員只有不斷學習、不斷積累經驗,才能更好地認識、掌握燃氣機組的調試。

  The installation and grid connected power generation of coking gas generator units involve various professional debugging such as electrical, thermal, and mechanical engineering, which require mutual cooperation among various professions to achieve grid connected power generation. The electrical system debugging runs through the entire stage of the commissioning of the dry coking gas generator unit. This article only introduces and summarizes the electrical professional debugging program. Many debugging and maintenance tasks still require guidance from professional technical personnel from equipment manufacturers to complete. In engineering practice, we will also come into contact with more different types of coking gas generator units. Only by continuously learning and accumulating experience can each debugging technician better understand and master the debugging of gas turbines.

  本文由 焦化氣發電機組   友情奉獻.更多有關的知識請點擊  http://m.pyucoin.com/ 真誠的態度.為您提供為全面的服務.更多有關的知識我們將會陸續向大家奉獻.敬請期待.

  This article is a friendly contribution from a coking gas generator set For more related knowledge, please click http://m.pyucoin.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

输入影片关键字...图片专区视频分类中文字幕91精选国产视频伊人首页牢记防走失 -- | 青青操精品久久| 岛国最新网址| 亚洲精品日韩-区二区三区| 日批caobi啊啊啊| 逼特逼视频.m3u| 成人性爱视频α√| 手机在线播放的黄色网址| 亚洲高清无码免费影院| 国产日韩欧美操日韩| 蜜乳高清精品中文无码高清精品| 导国黄色免费视频| 中久字幕一区二区三区人妻| 艹逼国产无码| 黄色av全免费| 色一色吧欧美| 日本小萝莉操逼二区三区四区| 色欲一二三区| 国产国产午夜精华| 久久久久九九精品免费视频| 国产老熟女乱伦视频一区二区| 色综合搞| 自拍偷拍小视频欧美| 人人摸人人舔人人搞| 激烈18禁高潮视频免费| 日韩妓女爱操B| 人人爱 人人摸| 国产一区二区丝袜精品| 三女一男做爰高潮A片| 操比无码| 熟女探花在线| 日韩视频人妻在线| 日韩中文一区二区三区| 亚洲av无码专区精品无码| 男女惨爱一区| 日韩性爱视频免费在线观看| 一起草 网址| 日本靠逼不卡在线| 黄色被操| 黄版视频在线观看| 中国勉费黄色| 女同亚洲精品一区二区三| 欧美aaa一级黄片| · 天天干天天日天天 | 午夜免费啪视频| 日韩高清人妻中文字幕| 久久清纯| 乱伦老熟女HD一区二区三区| 国产免费小黄片视频| wwwcom黄色视频无码网站| 18禁好看0000免费视频| 色一色吧欧美| 亚洲成人洋洋超碰| AV八戒| www黄高清无码| 广州东莞一级A片视频| www.亚黄色| 欧美18岁性爱视频| 操欧洲贵妇| 久久久久久久久久久久久久免费看 | 三级黄色A片日本三级| 美操逼操操逼操操逼操操逼逼操操逼操操逼打炮 | 久久久久久亚洲精品美女| 亚洲综合娱乐| 猛操日本小b视频小片| 亚洲1级黄色操人视频| 欧美AAA一级黄色片| 中文字幕操逼逼视频| 日韩性爱 ⅩⅩ| 一区二区字幕 先锋电影| 亚欧视频一级片| 性爱一级啪啪视频免费网站| 91 丨PORNY丨绿奴人妻| wwwwww操逼| JIZZ麻豆国产| 久久精品专区无码| 欧美狠狠玩| 午夜寂寞少妇无码久久久| 一级性爱黄色网址| 就操电影网| 久久久亚洲国产精品| 久久久久性爱18禁| 爱妻艺天天激情五月| ′WwW操| 欧性爱一区| 特大黄A片一区二区三区| 熟女性爱激情AV| 手机在线观看亚洲日韩免费视频播放| 奶水AV无码| 无码干干干| 欧美性爱呐呐呐哦| 国产亚洲精品亚洲精品亚洲精品| 精品在线日韩中文字幕| 日本特黄操逼| av午夜老司机av| 黄版视频在线观看| 一二三四区| 精品中文亚洲人妻| 香蕉成熟www.| 久久久国产这里有的是| 日han中文字幕| 一级性爱电影在线观看| 欧美捷克99久久综合另类小说| 国产午夜人妻熟女一区二区三区| aⅴ在线看视频| 好看的国产操逼视频| 无码 精品 国产| 乱伦日韩中文字幕| 欧美一区二区视频在线77777| 高清无码操逼高潮| 人人艹人人摸人人插| 色视频日韩| 婷婷亚洲五月天丁香| 人人操摸99| 91 久久 亚洲| 欧美一级岛国片免费观看| 色千人斩| 人人操人人人人| 2007人人操人人摸| 青娱乐免费三区| 色千人斩| 男女做爱欧美18禁| 伊人成人色一级黄片| 日韩精品国产视频| 兹力一区| 男女激情网站18禁| 思思久久99热美国| 日久精品不卡| 久久香蕉精品热| 国产精品 母子| 日本熟女视频房间| niuniuav在线观看| 精品美女三区四区| 球经,亚洲一区二区,欧美在线播放,日本中文字幕 | 日本小萝莉操逼二区三区四区| 日韩免费性爱在线| AV网站黄色| 本日色黄片XXXWWW| 亚洲AV无码国产精品桃色| 久久久国产精品无码网站| 操操操操操操逼| 激情五月天咪咪五月天| 激情文学婷婷五月| 欧美综合精品性爱| 亚洲 欧美片 麻豆| 香蕉导航 人妻| 欧美精品强奸乱伦| 爱爱十八禁| 亚欧无码屌屄网站大全| 天天躁日日躁AAAAXXXX1 xmovs.cc| 色午夜91| 日韩精品a一区二区三区人妻| 男女午夜激情十八禁在线观看| 人人艹人人干人人摸| 亚洲视视频强奸乱伦视频网| 日韩精品国产视频| 国产操逼高清无码| 真实91精品老熟女泻火| 中字無码舔阴香港91| 亚洲熟女久久久久| 久久久天天干| 亚洲精品人妻在线。| 超碰导航网址| 人人做人人爱人人叉人人插| 最新久久Av| 亚洲日韩精品中文字幕一区| 日本被黑人无码| 日本色色视频勉费| A片69X,CC| 91亚洲操| 啪啪视频18| 岛国123123| 欧美日韩一区专区| 人人人妻超碰| 青娱乐成人导航| 国产婷婷激情五月天| 日本久久伊人网| 性爽爽女子午夜刺激视频在线播放 | 久操无码限制级| 日本熟女视频房间| 久久丁香网五月男人天堂| 你懂的91福利视频| 欧美区精品| 国产经典无码久久| wwwcom18禁视频在线观看| 人人摸人人有 | 久久做热| 九九精品12| 日熟妇色| 青娱乐三级| 欧美男女啪啪啪免费视频网站| 日韩中文字幕专区| 欧美日韩精品一区| 高黄高潮网Aa| 欧美一级大片B| 日本九九黄色片| 免费不要钱的啪啪视频| 在线看综合avv| 国产熟女乱伦精品| 强奸乱轮片中文二区| 午夜888A片| 国产丰满老熟女视频| 日韩1区2区精品视频| 日韩剧情式AV| 人人肏人人操人人干人人| 丁香午夜啪啪啪| 自拍偷拍欧美一区| 一道本日本性爱| 秋霞无码免费A| 91韩国青草dj自慰无码| 国产亚洲精品亚洲精品亚洲精品| 久久99cbv| 老熟仑妇乱视频一区狂逼大战老熟女91 | 草草久久久亚洲av成人| 男女惨爱一区| 精品人气日韩在线| 午夜在线免费观看视频啊啊啊啊啊啊啊啊啊 好舒服 | 久久精品国产亚洲AV无码75欧| 久久久久思思热久久久久思思热久久久久思思热久久久久思思热 | 欧美自拍偷拍第二页| 996无码| 911国产自产图片人妻| 91xxx午夜| 亚洲无码免费高清版| Www.夜夜操| 免费很黄的网站| 欧亚免费成人电影 | 操逼视频免看区| 搡老女人老妇女老熟女αv| 人人插人人干人人摸| 国模AV啪啪一区二区三区| niuniuav在线观看| 一级a啪啪免费| 97人人操人人摸人人| 亚欧美啪啪| 天天干 天天做 天天射| 狂操女熟妇| 中文字幕操人妻91| 97人人操九七人人操人人| 猛操日本小b视频小片| 狠狠的操BB| 秋霞无码爽片| 乱伦交视频一区二区| 草bav| 立川理惠巨乳在线中文无码| 人妻欧美综合网| 看秋霞网站免费操逼片| 成欧美性爱| 狠狠肏无码视频| 国产视频A区B区秋霞| 性交免费一区| 嗯,哈啊哦啊,深一点~摸胸吃乳深一点~视频嗯 | 国产又粗又猛天天干| 人人干人人超人人干| 熟女人妻-91JQ就要激情网23.224.93.98:7000| 青青操久久久| 欧美AⅤ一区二区无码三麻豆| 性交爱一区| 伊人色爱激情的 | www,xxx草莓视频在线看| 4P手机福利视频| 97国产在线一区| 欧美ov视频在线观看| 曰韩一级性爱| 天天夜夜干| 九一视频操逼网| 欧美性爱19P-| 在线观看欧美18| GG51.COm少妇嫩模| 免费黄色Av| 91我要看逼| 91丨国产丨国产熟女| 操视频无码| 欧美日韩干操学| 亚洲丁香五月天堂av社区 | 日韩中人妻文字幕| 家庭乱伦性爱视频网| 人妻日韩欧美综合| 岛国在线观看视频资源网| 「俄罗斯精品无码一区二区」在线播放-俄罗斯精品无码一区二区高清播放-俄罗斯 | 97资源共享在线观看视频| 欧洲AV操逼| 国产黑料精品视频| 手机在线激情看片| 在线小黄片女神| 免费黄片网站在线观看| 人人插人人舔人人亲| 丁香熟女乱伦| AV爱爱一区首页| 成八性爱免费视频| 日日躁夜夜躁狠狠躁AV蜜臀| 操比 无码| av蜜乳逍遥| 最新亚洲国产精品| 色网站国产精品| AV爱爱一区首页| 国产 熟女 论乱 综合| 亚洲精品国产精品日韩精品| 熟女人妻偷人精品一区二区三区| 6080亚洲人久久精品69| 人妻中文日韩在线| 午夜福利乱伦| 欧美自拍偷拍第一页| 天天干天天射天天干人妻| 啪啪一区二区网站| 91人妻首页另类| 蜜桃日日日操操操| 在线人妻,| 丰满气质韵味十足熟妇网站| 天天干五月天| 亚洲人妻性视频| 五月天乱伦国产| 婷婷色丁香九月| 欧美性爱精品网| av午夜老司机av| 色婷婷综合激情免费播放| 人人操人人干人人摸人人| 在线儿手机可以看到黄色高清网站 | 欧美网站在线观看| 日屄无码小视频| 久久99精品久久免费| 八戒成人综合网站| pans久久| 久久66亚洲91| 日本色色视频勉费| 91免费操逼我们班的人了| 人人摸人人操人人插人| 日韩αv欧美αv在线视频| 欧美丁香五月天| 亚洲色图家庭乱伦国产| 免费在线观看性爱A| 人人摸人人杆人人橾| 国产偷拍23| 日韩AAA级黄片| 国产性一乱一性一伧一视一频| 强奸网站无码| 曰逼XXX| 久久99cbv| 无码被操视频网| 免费无码流血黄色| a√在线播放| 日本XXX操逼| 大香焦人人操| 日本视频操逼视频| 性爽爽女子午夜刺激视频在线播放 | 亚洲欧美自拍偷拍情| 噜噜噜久久| 成人在线免费性爱视频网站| 欧美性爱一区二区区| 乱轮视频污| 黄片黄影院| 人妻中文字幕好吊操| 美国久久黄片| 操逼秋霞| 人人爱人人摸人人要| 在线黄片,Com| 无码 精品 国产| 国产亚洲无码高清| 人人操人人人人操人人| 乱伦大香蕉电影| 外国成人无码超碰| www.av蜜| 超碰射人妻| 性爱AV 在线免费观看| 色1557综合网| 探花韵味熟女| 思思热久久视频| 秋霞无码爽片| 亚洲免费视频啪啪看看| 精品无码系列| 亚洲第一区探花| 亚洲人人操人人干人人摸不卡在线| 狠狠肏无码视频| 亚欧视频高清免费| 乱伦日韩中文字幕| 日啊v 在线| 五月天丁香婷婷另类| 男同麻豆啪啪啪啪啪啪啪| 蜜乳精品视频社区| 日韩人妻无码精品久久a免费| 超碰97人人超| 里里黄片免费观看| 欧美久久九九九在线| 城市成年人啪啪免费视频| 天天通天天透天天色综合网| 老熟女老熟妇性XXXⅩ| 国产av高清无码大全| 99精品导航| 色网站国产精品| 18禁激情视频| 亚洲欧美国产探花陪玩| 色综合一本射| Title:高清 无码 国产| 性爱视频成年人免费看| 手机在线激情看片| 曹逼逼福利| 国产精品久久熟女另类卡通小说| 希志av在线播放网| 美女被操18禁国产| 一级a啪啪免费看| 爽毛片三| 亚洲无码视图15| 色99丁香| 国产精品AV久久| 最新国产无码高清| 无码盗摄偷拍在线观看| 手机中文在线视频观看| 干干成人不卡视频| 秋欲浓手机| 久久乙乙久久久久久久久久久| www.色。com| 亚洲性爱区啪啪| 东京热综合久久久| 亚洲人妻性交| 国产东北一级毛卡免费| 黄片不卡在线橘子大神| 午夜免费操逼视频| 高跟丝袜成人在线观看| 免费下载黄片视频导航下载视频| 天堂无码a v视频| 国产精品yy| 18禁裸体美女无遮挡国产网站| 日韩A√高活| 欧美性爱19P-| 黄片WWW| 大香蕉网强奸乱伦的,中文版| 5A级黄色性爱观看| 抽插欧美日韩| 1000部啪啪啪啪视频| 高清无码爆操逼视频| 久操视频 com| 亚洲无码AV久久国产| 搡老肥熟女20视频免费| 偷拍与自偷拍亚洲精品| 国产免费小黄片视频 | 国产一英一区| 看日本操B| 香蕉超级大碰一区二区三区| 欧美精选啪啪视频| 美女裸身涩涩操逼欧美极品| aaaaaaa黄片| 狠狠人妻久久久久久综合老鸭窝| 69人妻天天干| 久热综合无码123| 后面操逼视频网站| 上海少妇性爱3pp| 久久久久-11| 日韩久久黄片| 午夜精品秘| 黄色AV地址一区| 午夜寂寞安卓精品。。。。| 日韩精选视频一区二区| 操逼视频网战九| aaa久久| 国产精品无码AV一三区| 人人插人人一区二区在线观看| 欧美日韩干操学| 韩国日本操逼| 家庭乱伦性爱视频网| 欧美a片大香蕉网| 亚洲人妻性爱| www,色吧| 91六月综合| 男女激情网站18禁| 黄色香蕉久久| 阴部Av在线| 日本三级综合网| 啪啪视频三区| 欧洲美女操逼逼| av首页导航在线| 夜夜操澳大利亚熟女的逼| 巨爆乳肉感一区二区三区无码福利姬| 欧美色吧综合在线| 国产经典无码久久| 亚洲成人与激情| 亚州精品乱码久久密桃| 91午夜热门| 亚洲精品久久久久58| 免费性爱观看| 狠狠操天天舔| 啪啪啪黄色18禁欧美| 日韩超逼| 日韩精选视频一区二区| 中文字幕国产精品欲求不满人妻| 日韩娱乐中文在线| 强奸视频国产| 岛国视频免费观看网址| 黄色爱爱| 乱伦3P电话| αV网站在线| 麻豆91黄片| 呦呦成免费网站| 中日乱伦中文字幕| 久久色视频免费看| 日韩精品一区二在线观看一起草| 午夜老司机免费视频| 草莓在线观看免费视频| 三区成人| 精品国产成人avav| 风韵熟女骚穴在线观看| 操操操天堂| 千人斩探花系列| 丰满人妻超碰在线| 亚洲国产精品wwww| 亚洲欧美成人无码精品综合| 图婷婷丁香| 丁香九月婷婷基地| 色 操网| 人人操人玩| 亚洲无马视频| 美女熟妇被小伙操| 人妻人操| 久久久久亚洲精品无码糸列| 上海市A级黄片| 啊V在线观看视频| 操逼视频下载无码| 日本午夜操屄| 欧美黄色大片三区四区| 淫色人妻导航| 狠狠操丰满人妻一区二区三区| 青青色操| 久久久性爱不停| 亚洲国产精品无码成人区| 中文字幕精品一区二区三区四区| 丁香九九久久月| 人妻欧美综合网| 日本天堂a在线播放| 日本高清色色| 导国黄色免费视频| 大香蕉毛片网| 人人操人人人人操人人| 亚洲中文天天操| 国产女人高潮嗷嗷| 午夜福利操逼| 综合色婷| 乱轮视频污| 偷拍与自偷拍亚洲精品| 国产乱伦女| 黄片看黄片免费黄片| 亚洲国产精品成人精品无码专区| 无码高清黑人一区二区三区| 综合久久凹凸| 色就是色欧美激情| 八戒成人视频| 操逼视频日韩| 17 国产 综合| 蜜乳Av电影网| 久久探花欧美日韩| 操逼一级无码| 亚洲人人操人人| 91人妻视屏| 美日韩操逼操逼操逼| 操逼操逼操逼操操操操操| 欧美日韩熟人操老逼| 亚洲av无码专区精品无码| 美国一级,欧洲一级日韩AV在线免费播放| 韩国久久无码系列| 亚洲国产另类久久久精品网站| 蜜臀a久免费自慰在线观看| 亚洲视视频强奸乱伦视频网| 91丝袜足交精品| AAAA高潮免费视频| 区97视频| 色午夜91| 女同毛片一区二区三区| 美国久久黄片| 啪啪电影免费视频| 超碰小姐| 午夜操逼福利视频| 日韩精美视频一区二区| 日韩精品无码人妻一区二区三区| 欧美性爱牛牛色| “成人一区”| 欧美在线观看免插件| 噜噜噜噜噜久久久久久91| 亚欧曰韩AV第一部| 成人无码久久久| 夜夜草av| 亚洲色图乱伦av| 日日久麻豆国产| 日韩欧美性爱视频十八禁网站| 青草熟女久久久| 啪啪啪免费试看视频18岁以下禁看| 亚洲人妻性视频| 欧美亚洲免费高清无码| 久久精品国产亚洲AV无码75欧| 亚洲无码AV久久国产| swag福利视频| 无码少妇精品一区二区动态| 性爱人人操人人干看| 国产强奸乱伦免费视频| 中日韩精品一二区| 欧美午夜三级片使用器具| 亚欧av操| 日本黄色视频舔高朝| 色色色无码AV色色| 性爱视频成年人免费看| 性爱AV网站在线观看免费| 日韩精品人妻优惑| 人人摸人人操人人插人| 手机今晚视频在线观看| 十八禁色情免费网站在线观看| 天天夜夜一级A片免费看| 国产 日大逼| 国产无码av.com| 欧美AAAAAA黄片| 激情综合交换啪啪麻豆| 亚洲家庭乱伦网址| 极品色极极影院| 秋霞操逼欧美| 亚洲美女精品久久久久久久久2020 | 那个网站有免费黄色片看| 无圣光小视频| 国产任我爽视频| 高清无码爆操逼视频| 人人摸人干| 夜夜情夜夜操| 人人性人人摸| av浏览网站在线观看| v.md操逼av| 小日子操bb| 另类综合自拍盗摄| 三上悠亚一区二区三区视频| 中文精品字幕在线| 久久久久久久国产AV撸| 亚洲强奸乱论免费视频| 黄色日p视频| 美日韩黄色操B| 欧美日韩精品第25页| 超碰国产Av成人| 国产精品高清无码强奸wwwwwww| 日韩一区二区三区精彩视频| 天天影院青青早| www,操| 偷窥自拍色干网| 十八禁动作大片帅哥美女在线免费观看看到下面湿 | 欧美成人日韩性爱视频| 国产黄色偷拍自拍| 欧美日韩干操学| 麻豆视频地址一地址二地址三高清无码91视频| 性爱一级啪啪视频免费网站| 久久狂干| 人摸人人| 亚洲国产精品乱伦| 日韩强奸乱伦片中文字幕| 日韩精品人妻一区二区视频| 狂操女熟妇| 秋霞色色视频| 一级aV网站在线免费观看| 婷婷天天搞| 人人操,天天操| 人人摸网站| 九月丁香亭亭| 操逼视频网战九| 超级超碰成人Av| 日韩,颜射口爆| 人人操人人爱人人操人人| 国产东北一级毛卡片免费69| 高清美女被操91| 亚洲午夜乱伦AV| 九九久久免费视频| 无码怼一怼操一操| 黄色片手机在线| 色网站国产精品| 一起草在线成人影视观看| 日本五十路熟女网页| 国产AV强奸| 一级片网站久久| 免费看黄片全集| 色千人斩| 中文字幕秘 一区二区人妻| 久一久视频| 啪啪视频免费日韩| 欧洲老人色COM| 你懂的片子麻豆| 尹人网午夜视频| 登录国产老妇女黄色一区二区三区| 久久久久国产精品熟女| 日本港澳操逼视频| 黄色片最新网址| 一道本免费AⅤ| 韩国免费看伦人伦a片子| 成人性爱视频α√| 另类熟女网| 欧美V亚洲V综合Ⅴ国产V| 亚洲色婷婷999精品网站| 影音先锋在线观看资源 日韩| 搜索日韩操逼大片搜索日韩| 精品黑人一区二区三区免费看| αV视屏| 欧美精品18性视频| 香蕉aaaa| 一道本啪啪视频| 激情精品在线| 高清AV色哟哟| 神马午夜A片| 久久精品国产亚洲AV无码75欧| 久操青青在线观看| 亚洲日韩熟女中文字幕| 日韩二区精品视| 色妞av| 欧美亚洲成人免费在线观看| 偷拍自欧美日韩视频| 熟女伦网| 翔天千里中文字幕| aaa午夜在线观看| 手机黄色在线看| 天天操综合平台 | 性爱小姐久久| 国产超碰熟女一区| 日韩人妻在线一二| 中文日韩资源字幕一区| 最新欧美丰满人妻性爱网站| 全国免费啪啪视频| 亚洲综合娱乐| 天美不卡AV| 日han中文字幕| 日本香蕉5级黄色视频| 亚洲日必视频| avseseluanlun| 亚洲强奸乱论免费视频| 亚洲无码AV久久国产| 放映国产操逼的| www.尤物. com| 操操人97| 操网站91| 亚欧免费看污黄网站大全大胸| 乱中年女人伦AV| 两性小说亚洲欧美| av在线aaa| 成年人在线观看免费性爱视频| 玖玖玖这里只精品免费| 久久久久妇女啪啪性爱活动| 超碰偷拍自拍| 人人摸人人持| 26uuu的视频| 久久丁香网五月男人天堂| 另类综合自拍盗摄| 尤物网站在线观看| 久久精品国产系列| 久久狂干| 91无码xXX视频| 啪啪Av| 日本日B无插件| 曰批免费40分钟免费观看无码| 精品无码操逼91| 跪求免费黄片视频| 激情文学婷婷五月| A天堂v| 「俄罗斯精品无码一区二区」在线播放-俄罗斯精品无码一区二区高清播放-俄罗斯 | 91天美| 国产 无码 二区| 亚洲欧美16页| 大香蕉乱伦熟女| 国产伊人干91| 久久精品国产亚洲AV无码75欧| 91妻女| 老熟妇乱伦一区二区三区四区五区| 啊V在线观看视频| 黄色五码网站| 欧美色吧综合在线| 人人弄人人操人人摸| 秋霞在线视频一区二区三区四区| 亚洲精品五区| 激情3p少妇在线视频| 免费观看黄色| 本土乱伦3P自拍视频| 日本三级B| 丁香九九久久月| 国产 无码 二区| 超碰91亚洲无码| 一级黄色视频性交| 2020这里只有精品久久| 黄色av网站黄色| 艹逼高清无码免费视频| 国产国产午夜精华| 熟女精品探花| 做爱18禁免费观看网站| 日韩一级成人性爱免费在线观看| 偷拍与自偷拍亚洲精品| 成人被窝AV| 可以在线免费观看的黄色片网址在线观看免费| 免费老熟女乱论| 夜夜草导航 久久视频| 小逼久久久| 免费无码婬片A片AAA毛片红楼| 亚州精品乱码久久密桃| 一级全黄少妇性色生活片A级| 蜜乳AⅤ免费观看| 中文字幕精品亚洲熟女| 狠狠操108| 人人操大香蕉992| 天天草夜夜肏| 国产又粗又猛天天干| 人人操人人插人人干爱| 操逼电影五月| 强奸免费视频网站| 欧美姓爱一二三区| 久久亚洲美女播放| 国产精品久久久久久aV| av在线aaa| 久久久久久亚洲高清无码| 日韩极品区| 操b在线| free.91N| 自拍 视频 在线 夜草| 在线免费播放视频黄片| AV日操| 凹凸视频在线导航| Jizzjizz蜜臀Av免费观看| 超碰免费人妻自拍丰乳肥臀| 日美中操屄| 国产岛国欧美在线免费| 美国一区二区视频| va亚洲乱伦| 国产精品无码一区二区视频观看| 国产东北一级毛卡免费| 少妇3p在线| 青娱乐极品视频福利在线| 日韩性爱 ⅩⅩ| 国产农村妇女一级毛卡片| 美女成人超碰在线 | 欧美男女啪啪啪免费视频网站 | 台湾草莓视频在线观看| 国产精品高清无码强奸wwwwwww| 天天干天天射天天干人妻| 熟女人妻-91JQ就要激情网23.224.93.98:7000 | 华人91在线| 精品久久久久中文字幕18| 午夜caob| 亚洲性爱AV在线| 久久精品亚洲无码国| 中国免费黄片| 99久久久久久无码国产精品性| 国产久xx黑料社| 殴亚AV在线| 逼视频凸91| 一起草无码视频在线播放| 五丁香天堂美女| 国模无码一区二区三区久久 www.ykjinhaoda.com www.ka2d.com www.bxgyy.com | 久久精品国产av无码| av试看一区| 色综合天天干天天射| 男人天堂网2024| 五月综合人妻| 久久在免费线2020年日本| 久久乐一区二区三区| 精品十八禁网站在线| 我要操老司机我要操| 日韩情趣视频一区| 国产伊人自拍| 狠狠肏无码视频| 猛操日本小b视频小片| 精品久久久久久亚洲精品| 涩综合永久入口| 婷婷在一区二区| 91妻女| 熟女老太日本| 日韩欧美色综合| 欧美黄色一级AAAAA| 天美不卡AV| 欧美性爱区第一| 黄皮AAA级一区二区三区| 91蝌蚪人妻| 猛操日本 小b视频| 一本大道色婷停在线| 我的色综合| 嘿嘿嘿视频在线观看电| 天天搔夜夜操作业务| 秋霞三级做爱A片| 亚洲色站强奸乱伦| 欧美极品黄色大片| 欧美aⅤ| 可以看的AV网站| 手机可以看的av网站| 爱操.av| 在线观看黄色大片网站 | 强奸乱伦天堂亚洲一区| 日韩中文字幕美颜人妻| 国产岛国欧美在线免费| 极品国产裸体美女嫩穴| 五月丁香视频一区| 久久久无码Av| 日本a片网址| 久久66亚洲91| 无码片欧美| 皇色网址www无码www| 夜夜狠狠操| 国产剧情操逼视频| 日韩黄色片久久| 91人妻热| 亚洲精品无码久久久久不| 搞干免费视频| 天天看夜夜| 日韩操逼视| 我要看免费的AV大片| 亚洲熟女久久久久| 无 码 久 操 视 频| 久操性爱视频在线| 性爱小姐久久| 超碰熟女丰乳肥臀| 日本在线视频不卡黑料福利| 综合色婷| 91人妻首页另类| 成人性爱视频α√| 成人 激情 无码| 91丨插插插永久免费库存| 日韩精品无码人妻一区二区三区 | 日韩无码性爱一区二区| 欧美亚洲操逼片| 黑人久草AV| 91狼人pro| 人伦片中文字幕一区二区| JiZZJiZZ国产精品| 亚洲视频一区二区三区四区| 日操夜操青日操夜操青日操夜操青日操| 无码爽播| 欧美玣奸网站| 国产橾逼| 青青草老司机免费在线视频| 日韩中文字幕专区| 日韩精品–色哟哟| 操久电影| 黑人无码三区| 婷婷激情色干亚洲| 欧美一级无遮挡| 欧美性爱人妻交换| 蜜乳高清精品中文无码高清精品| 秋霞电影啪啪| 亚洲成人激情另类小说 | 无码专区性爱| 操操操天堂| 国内精品嫩模AV私拍在线| 美国一级,欧洲一级日韩AV在线免费播放| 国产Chinese男男gv视频| 精品视频人妻久久| 高清免费网站做爱| 色乱精密| 极品电影院色| 东北熟妇啪啪| 乱伦中文字幕高清| 迷奸乱伦视频网| 欧美日韩干操学| 国产激情婬妇A片视频在线播放| 全国免费啪啪视频| baoyu135国产最新更新内容| 91人妻中文字幕| 精品在线日韩中文字幕| 91熟女视频免费观看| 国产精品推荐无码高清| 丝袜18禁| 操逼无码专区| 欧美强奸免费观看视频| 免费视频在线观看不卡2| 亚洲乱伦va| 欧美性爱 人人| 欧美承认性爱视频| 亚洲人妻性爱| 乱伦91#| 黄色三视频| 日韩精品中文字幕一区在线观看| 性爱日韩性爱| 久操大| 岛国片欧美| 26uuu亚洲精品国产最新章节内容| 哟哟15以下AV资源| 世界av综合在线观看| 久草欧美日韩熟女精品| 青青青操操| 欧美操逼在线视频| 操逼人妻无码| 日本a v在线播放第一页| 91六月综合| 日韩色吧无码影院| 九九性爱大片视频| AV乱伦军装网| 日韩无码对对碰视频| 日韩男女裸体操逼片| 国产午夜人妻熟女一区二区三区| 超碰熟女丰乳肥臀| 一区二区三区国产探花视频免费体验| jiujiuyazhuoav| 日韩乱轮片子| www乱伦大香蕉| 蜜乳国产| 看黄色片在线| 美国无码久久| 球经,亚洲一区二区,欧美在线播放,日本中文字幕| 久久最新亚洲| 天堂狼狼干伊人网| 欧美日韩性爱高清视频一区 | 久操性爱视频在线| 狠狠操丰满人妻一区二区三区| 青草社区| 天天搞视频在线看| 91精品在线凹凸视频| 一区二区三区四区五区六区兽交毛片| 乱伦剧情中文字幕| 色窝窝AV无码一区二区| 免费色视屏| 成人超碰精品| 成人视频性爱在线免费观看| 大象一区二区| 国绯色AV一二三在线| 啪啪Av| 啪啪一区二区网站 | 亚洲AV在线网站| 搜亚洲操逼网| 性爱视频18| 操逼日| 亚洲无码强奸乱伦无码AV电影| 欧美偷拍私密视频| 久久久久亚洲超碰| 日本熟女精品| 少妇丨PORNY丨自拍下载| 色综合导航网站| 欧美高清激情岛国片| 午夜网站在线播放国产高跟鞋| 8090.aa| 國产家廷乱轮| 亚洲乱伦精品区| 老牛牛影视久久久久久成人片| 亚洲国产精品久久久久婷婷青年| 天天色天天射天天操| 无码操逼高清视频1| 大波人妻图片区| 夜夜操小姐| av无码国产| 最新强奸乱伦视频| 日人妻精品在线观看| 久久亲子伦高清| 国产熟女乱伦精品| 爆乳丰满中文字幕一区| 美女成人超碰在线| AV久久草| 成人亚洲国产精品| 岛国片在线免费观看| 青娱乐三级| 熟女俱乐部一区二区在线观看| 免费色视屏| caobi高清| 强艹逼视频网站| 国产配美女无码| 免费kanhuangpian日韩| 欧美2区| 亚洲AV九九九| 色呦呦网址网站| 成人免费性爱视频网站大全 | 国产操逼视频1| 99操逼免费| 91乱伦17c| 曰批视频免费看| 蜜乳avwww| free.91N| www午夜91| av黄色字幕网| 久久久久性爱18禁| 东京热综合久久久| 亚洲天堂 国产 有码| 欧美性爱人妻交换| 大片一区二区三区四区五区六区| 跪求免费黄片视频| 91干熟| 欧美性爱污麻豆| 黄色片手机在线| 人人射天天操| 国产操逼高清无码| 日韩女人口交鸡巴视频录像动态图片| 欧美边做饭边操B| 乱色熟女一区二区| 青娱乐一区二区三区视频| 一个色综合国产色综合| 午夜精品无码91| 九九精品无码在线观看| 强奸乱伦亚洲无码视频| 日本熟女免费观看视频| 91乱un| 手机看A片网站| gv网国产| 亚洲精品久久久久久久久av| 蜜乳高清精品中文无码高清精品| 麻豆乱伦片| 欧洲无码性爱视频| 美国天堂Av在线| 男女AⅤ天堂在线| 日韩精美视频一区二区| 熟女午夜操视频| 久久久AV无码网站| 天天躁日日躁AAAAXXXX-百度| 十八禁性爱视频| 泰国小美女操逼日一区二区| 久久久国产精品无码网站| 国产av无码久久久| 日小逼操小B视频| www.12com黄片| 性爱视频黄色电影| 黑人狂干俱乐部色一区二区| 三区成人| 欧美一级aaaa黄片| 欧美五十路熟女视频| 国产家庭乱伦200000部| 九j九无码| 日韩精品无码人妻一区二区三区| 草莓在线观看免费视频| 免费看黄片全集| baoyu135国产最新更新内容| 99操澡| 冷热淫荡少妇视频| 性爱成人小视频在线| 日韩美女操逼影库| 岛国AV在线一| 操逼视频下载无码| 一区二淫乩| 天天搞天天| 在线免费看性爱视频| 思思av| 高清国产女人操逼| 无码专区高清成人视频| 亚洲AV永久无码牛牛影视| 韩国免费看伦人伦a片子| 亚洲乱伦va| 国产强奸视频网址| 男女激情视频网| 国产α√| 国模视频资源小说| 亚洲精品国产成人无码在线| 牛牛牛无码| 岛国视频在线看| A国产在v| 草草影院CCYYCOm屁屁百度| 无圣光小视频| 十八禁乱伦91| 久章操视频在线| 午夜在线操逼视频| 26uuu亚洲精品国产最新章节内容| 日韩性爱成| 极品色网在线| 国产欧美日逼| 日本港澳操逼视频| 人人添人人操人人摸| 操熟女91在线视频| 久久乐一区二区三区| 超碰射人妻| 亚洲超碰2016| 日本高清色色| wwwwww操逼| 熟女老太日本| 电影大香蕉乱伦| 人人操大香交在线| 九九黄色大全| 精东影业一级毛片免费看| 亚洲国产久久久| 密乳tv手机在线观看| 黄色一级片AAAA| 蜜乳AV色欲| www.黄色操| 中文无码操逼视频| 久久久久久久国产精品无码AV| 日本操Bxxxxx| 日韩欧美成人牲爱视频|