投資瓦斯發電可實現較好的收益
 
Investment in gas power generation can achieve better returns
 
瓦斯電站投資:3000-4000元/KW;機組保證連續運行功率400kW,年運行時間可達300天以上;
 
Investment of gas power station: 3000-4000 yuan / kW; the unit can guarantee continuous operation power of 400KW, and the annual operation time can reach more than 300 days;
 
一臺瓦斯氣發電機組年發電量:300萬kwh(消耗純瓦斯100萬立方米每年);
 
Annual power generation of a gas generator unit: 3 million kWh (consumption of 1 million cubic meters of pure gas per year);
 
一臺瓦斯氣發電機組年發電收益:120萬元(電價按0.4元/KWh計);
 
Annual power generation income of one gas generator unit: 1.2 million yuan (electricity price is calculated as 0.4 yuan / kWh);
 
一臺瓦斯氣發電機組年運行成本包括機油消耗、人員工資、設備維護、設備折舊等,發電成本在0.10元/kWh左右。
 
The annual operation cost of a gas generator unit includes oil consumption, personnel wages, equipment maintenance, equipment depreciation, etc., and the power generation cost is about 0.10 yuan / kWh.
 
一臺瓦斯氣發電機組年運行成本成本=0.10元/kWh×300萬kWh=30萬元
 
The annual operation cost of a gas generator set = 0.10 yuan / kWh × 3 million kwh = 300000 yuan
 
一臺瓦斯氣發電機組年收益:年收益=年發電收益-年總成本費用=120萬元-30萬元=90萬元
 
Annual income of a gas generator unit: annual income = annual power generation income - annual total cost = 1.2 million yuan - 300000 yuan = 900000 yuan
 
瓦斯發電站的余熱效益
 
Waste heat benefit of gas power station
 
瓦斯發電站還可采用熱電聯供系統,可以為煤礦提供生活用熱水,從而大限度地實現瓦斯的綜合利用。一臺500GF1-3RW瓦斯發電機組,排煙溫度為500℃左右,通過煙氣余熱鍋爐,吸收排煙余熱,1臺機組可產生354.5kg/h 壓力是0.4MPa的飽和蒸汽(飽和溫133℃)。
 
The gas power station can also adopt the combined heat and power system, which can provide domestic hot water for coal mines, so as to realize the comprehensive utilization of gas to a large extent. A 500gf1-3rw gas generator set, the exhaust gas temperature is about 500 ℃, through the flue gas waste heat boiler to absorb the exhaust heat, one unit can produce 354.5kg/h saturated steam with pressure of 0.4MPa (saturation temperature of 133 ℃).
 
余熱鍋爐余熱效益:
 
Waste heat benefit of waste heat boiler:
 
電站年運行時間按300天計,每噸蒸汽按70元計算。一臺瓦斯氣發電機組年可產生蒸汽量=354.5kg/×24h×300天。尾氣余熱效益為:2500t×70元/t≈17.5萬元。
 
The annual operation time of the power station is calculated as 300 days and 70 yuan per ton of steam. The annual steam generation capacity of a gas generator unit is 354.5kg/24h × 300D. The waste heat benefit of tail gas is 2500t × 70 yuan / T ≈ 175000 yuan.
新聞搜索
濟南濟柴環能燃氣發電設備有限公司
  • 服務熱線

    0531-62325028
    0531-69951266

瓦斯發電投資經濟效益分析

投資瓦斯發電可實現較好的收益
 
Investment in gas power generation can achieve better returns
 
瓦斯電站投資:3000-4000元/KW;機組保證連續運行功率400kW,年運行時間可達300天以上;
 
Investment of gas power station: 3000-4000 yuan / kW; the unit can guarantee continuous operation power of 400KW, and the annual operation time can reach more than 300 days;
 
一臺瓦斯氣發電機組年發電量:300萬kwh(消耗純瓦斯100萬立方米每年);
 
Annual power generation of a gas generator unit: 3 million kWh (consumption of 1 million cubic meters of pure gas per year);
 
一臺瓦斯氣發電機組年發電收益:120萬元(電價按0.4元/KWh計);
 
Annual power generation income of one gas generator unit: 1.2 million yuan (electricity price is calculated as 0.4 yuan / kWh);
 
一臺瓦斯氣發電機組年運行成本包括機油消耗、人員工資、設備維護、設備折舊等,發電成本在0.10元/kWh左右。
 
The annual operation cost of a gas generator unit includes oil consumption, personnel wages, equipment maintenance, equipment depreciation, etc., and the power generation cost is about 0.10 yuan / kWh.
 
一臺瓦斯氣發電機組年運行成本成本=0.10元/kWh×300萬kWh=30萬元
 
The annual operation cost of a gas generator set = 0.10 yuan / kWh × 3 million kwh = 300000 yuan
 
一臺瓦斯氣發電機組年收益:年收益=年發電收益-年總成本費用=120萬元-30萬元=90萬元
 
Annual income of a gas generator unit: annual income = annual power generation income - annual total cost = 1.2 million yuan - 300000 yuan = 900000 yuan
 
瓦斯發電站的余熱效益
 
Waste heat benefit of gas power station
 
瓦斯發電站還可采用熱電聯供系統,可以為煤礦提供生活用熱水,從而大限度地實現瓦斯的綜合利用。一臺500GF1-3RW瓦斯發電機組,排煙溫度為500℃左右,通過煙氣余熱鍋爐,吸收排煙余熱,1臺機組可產生354.5kg/h 壓力是0.4MPa的飽和蒸汽(飽和溫133℃)。
 
The gas power station can also adopt the combined heat and power system, which can provide domestic hot water for coal mines, so as to realize the comprehensive utilization of gas to a large extent. A 500gf1-3rw gas generator set, the exhaust gas temperature is about 500 ℃, through the flue gas waste heat boiler to absorb the exhaust heat, one unit can produce 354.5kg/h saturated steam with pressure of 0.4MPa (saturation temperature of 133 ℃).
 
余熱鍋爐余熱效益:
 
Waste heat benefit of waste heat boiler:
 
電站年運行時間按300天計,每噸蒸汽按70元計算。一臺瓦斯氣發電機組年可產生蒸汽量=354.5kg/×24h×300天。尾氣余熱效益為:2500t×70元/t≈17.5萬元。
 
The annual operation time of the power station is calculated as 300 days and 70 yuan per ton of steam. The annual steam generation capacity of a gas generator unit is 354.5kg/24h × 300D. The waste heat benefit of tail gas is 2500t × 70 yuan / T ≈ 175000 yuan.
精品至在线观看| 西西GOGO顶级艺术人像摄影| 91 蝌蚪 日韩 无码| 黄色无码网站| 国产视频手机在线观看| AV一级片| 一级日本性| 2v少妇无码一区二区| 996中文在线| 中文字幕二区| 家庭乱伦网站国产| 17c嫩草51久久91嫩草| 亚洲亚洲人成综合网络| 91成人无码视频| 国产性生活二级免费看| 偷欢人妻13p| www.高清无码.com| 亚洲性爱网站| 国产69精品久久久久久久| 高清无码啪啪| 久久老熟女| 99精品欧美一区二区三区综合在线| 久久精品国产AV一区二区三区| 免费在线不卡看av| 精品无码色| 精品96人人人人人人人人人人人 | 999高清无码 飞蜜桃| 免费AV一区二区久久| 九色蝌蚪在线视屏| 国产亚洲久一区二区| 丁香五月婷婷综合| 91蜜桃专区无码乱码| 久色在线播放| 女自慰喷水精品www久久| 91/色黄免费在线| 久久亚洲无码| 日韩无码不卡| 亚洲性爱视频| 91蝌蚪九色亚洲视频| 91少妇性爱高潮视频| 中文字幕在线播放|